No | Nama Peserta | K | A | T | ST | P | PT | HN | H | P | PK | Alasan |
---|---|---|---|---|---|---|---|---|---|---|---|---|
1 | CV. Krisna Jaya - 01.660.520.6-923.000 | 63,7 | Rp. 87.732.000,00 |
Rp. 87.732.000,00 |
Tidak menghadiri pembuktian kualifikasi | |||||||
2 | CV. ARCHILOGIC - 03.137.786.4-922.000 | |
|
|||||||||
3 | CV. ZEMY - 01.600.747.8-922.000 | |
|
|||||||||
4 | PT. DECONT MITRA CONSULINDO - 01.970.594.6-922.000 | Rp. 93.082.000,00 |
Rp. 93.082.000,00 |
Tujuan Surat Penawaran Tidak Sesuai | ||||||||
5 | CV. DISEN KONSULTAN - 02.743.647.6-922.000 | Rp. 94.101.000,00 |
Rp. 96.026.000,00 Melebihi Nilai Total HPSMelebihi Pagu |
Nilai Penawaran Terkoreksi Melebihi Nilai HPS | ||||||||
6 | PT. SIARPLAN UTAMA KONSULTAN - 01.475.355.2-922.000 | |
|
|||||||||
7 | CV. Teknik Perdana - 01.970.531.8-922.001 | |
|
|||||||||
8 | CV. Galaksi Permai Konsultan - 01.970.635.7-924.000 | |
|
|||||||||
9 | CV. Detail Engineering Disain Consultan - 02.076.952.7-923.000 | |
|
|||||||||
10 | CV. KUKUH ABADI - 01.600.884.9-922.000 | |
|
|||||||||
11 | CV. Oebazin Consultant - 02.948.678.4-924.000 | |
|
|||||||||
12 | CV. DESAKON - 02.536.888.7-922.000 | |
|
|||||||||
13 | CV. SAHWANA - 02.427.790.7-922.000 | |
|
|||||||||
14 | CV. ARILES DESIGN - 02.536.874.7-922.000 | |
|
|||||||||
15 | CV. MULTI CIPTA DESIGN - 01.820.714.2-922.000 | |
|
|||||||||
16 | CV. Irsyadi Consult - 03.029.986.1-922.000 | |
|
- A Evaluasi Administrasi
- T Evaluasi Teknis
- ST Skor Teknis
- P Penawaran
- PT Penawaran Terkoreksi
- HN Hasil Negosiasi
- K Evaluasi Kualifikasi
- SK Skor Kualifikasi
- SB Skor Pembuktian
- H Evaluasi Harga/Biaya
- P Pemenang
- PK Pemenang Berkontrak