No | Nama Peserta | K | SK | SB | B | A | T | ST | P | PT | HN | H | SH | SA | P | PK | Alasan |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
1 | CV. MULTI CIPTA DESIGN - 01.820.714.2-922.000 | 81,1 | 74,21 | Rp. 178.178.000,00 |
Rp. 178.178.000,00 |
100,0 | 79,37 | ||||||||||
2 | PT. DWIPA MITRA KONSULTAN - 74.659.079.3-922.000 | 82,3 | 68,14 | Rp. 180.180.000,00 |
Rp. 180.180.000,00 |
98,89 | 74,29 | ||||||||||
3 | CV. EL EMUNAH - 02.069.119.2-922.000 | 86,7 | 68,88 | Rp. 181.110.600,00 |
Rp. 181.110.600,00 |
98,38 | 74,78 | ||||||||||
4 | CV. DESAKON - 02.536.888.7-922.000 | 5,0 | Tidak menghadiri pembuktian kualifikasi | ||||||||||||||
5 | CV RAHILSTAN ENGINEERING - 02.307.835.5-924.000 | 46,1 | |||||||||||||||
6 | CV. GUNATAMA DESAIN - 02.598.437.8-921.000 | 5,0 | Tidak menghadiri pembuktian kualifikasi | ||||||||||||||
7 | CV. KOORDINAT TEKNIKA - 76.977.916.6-924.000 | 23,3 | |||||||||||||||
8 | CV. KUKUH ABADI - 01.600.884.9-922.000 | 5,0 | Tidak menghadiri pembuktian kualifikasi | ||||||||||||||
9 | MULTIKREASI ENGINEERING, CV - 70.460.678.9-922.000 | 5,0 | Tidak menghadiri pembuktian kualifikasi | ||||||||||||||
10 | CV. Sains Group Consultan - 01.600.835.1-922.000 | ||||||||||||||||
11 | CV. Detail Engineering Disain Consultan - 02.076.952.7-923.000 | ||||||||||||||||
12 | PT. SIARPLAN UTAMA KONSULTAN - 01.475.355.2-922.000 | ||||||||||||||||
13 | Cv. Karya Handal Konsultan - 01.600.825.2-922.000 | ||||||||||||||||
14 | CV. DONGKAR DOLA SAKTI - 82.774.599.3-924.000 | ||||||||||||||||
15 | CV. Graha Mandiri Pratama - 02.537.180.8-922.000 | ||||||||||||||||
16 | CV. Irsyadi Consult - 03.029.986.1-922.000 |
- A Evaluasi Administrasi
- T Evaluasi Teknis
- ST Skor Teknis
- P Penawaran
- PT Penawaran Terkoreksi
- HN Hasil Negosiasi
- SH Skor Harga
- SA Skor Akhir
- B Pembuktian Kualifikasi
- K Evaluasi Kualifikasi
- SK Skor Kualifikasi
- SB Skor Pembuktian
- H Evaluasi Harga/Biaya
- P Pemenang
- PK Pemenang Berkontrak