No | Nama Peserta | NPWP | Harga Penawaran | Harga Terkoreksi |
---|---|---|---|---|
1 | CV. WIDRA 4 | 01.600.574.6-922.000 | Rp. 251.405.000,00 | Rp. 251.405.000,00 |
2 | CV. DISEN KONSULTAN | 02.743.647.6-922.000 | Rp. 274.769.000,00 | Rp. 274.769.000,00 |
3 | CV. Irsyadi Consult | 03.029.986.1-922.000 | Rp. 284.361.000,00 | Rp. 284.361.000,00 |
4 | CV Triparty Tirta Engineering | 03.137.877.1-922.000 | ||
5 | PT. ACIDATAMA PERKASA CORPORINDO | 81.587.678.4-924.000 | ||
6 | CV. Detail Engineering Disain Consultan | 02.076.952.7-923.000 | ||
7 | CV. KUKUH ABADI | 01.600.884.9-922.000 | ||
8 | CV. BIAS MONARCHY KONSULTAN | 02.547.885.0-805.000 | ||
9 | CV. SABA CONSULT | 02.427.631.3-922.000 | ||
10 | PT MITRA TRI SAKTI | 01.413.445.6-901.000 | ||
11 | CV. BINA CIPTA UTAMA | 01.720.241.7-922.000 | ||
12 | CV. Oebazin Consultant | 02.948.678.4-924.000 | ||
13 | CV. ARCHILOGIC | 03.137.786.4-922.000 | ||
14 | CV. Sains Group Consultan | 01.600.835.1-922.000 | ||
15 | CV. REMBONG NAWA | 03.110.667.7-924.000 | ||
16 | CV. MULTI CIPTA DESIGN | 01.820.714.2-922.000 | ||
17 | CV. DESAKON | 02.536.888.7-922.000 | ||
18 | MULTIKREASI ENGINEERING, CV | 70.460.678.9-922.000 | ||
19 | CV RAHILSTAN ENGINEERING | 02.307.835.5-924.000 | ||
20 | CV. DONGKAR DOLA SAKTI | 82.774.599.3-924.000 | ||
21 | Sistem Fisik Siber | 86.380.049.6-801.000 | ||
22 | CV. KROMATIK KREASI KONSULTAN | 84.988.374.9-922.000 |